|
kaizenworld.com
|
0 earned Badges No badges were found
Definitions (27)
1 |
0
0
80/20 rule
Italian mathematician, Pareto, showed that 80% of frequency is caused by 20% of the issues.
Meaning awaits approval from a moderator |
2 |
0
0
Andon
An andon is a tool of visual management, originating from the Japanese for 'lamp' and is a set of lights placed on machi [..]
Meaning awaits approval from a moderator |
3 |
0
0
blast
Rapid Process Improvement following a standard format
Meaning awaits approval from a moderator |
4 |
0
0
bottleneck
Bottleneck -- Any point in manufacturing operations at which movement is slowed because demand placed on a [..]
Meaning awaits approval from a moderator |
5 |
0
1
Brainstorming
A confirmed process to creatively and efficiently generate a high volume of ideas through an approach that is [..]
Meaning awaits approval from a moderator |
6 |
0
0
Chaku-chaku line
A production line where the only human activity is to 'chaku' or 'load' the machines. The machines eject the f [..]
Meaning awaits approval from a moderator |
7 |
0
0
Counter-clockwise flow
A basic principle of lean production cell layout is that the flow of material and the motion of people [..]
Meaning awaits approval from a moderator |
8 |
0
0
cycle time
Manufacturing cycle time is often confused with production lead-time. Cycle time is the time it takes to do one [..]
Meaning awaits approval from a moderator |
9 |
0
0
Elements of work
The elements of work are
Meaning awaits approval from a moderator |
To view all 27 definitions, please sign in.